Cold storage installation
Release time: January 5, 2022 05:53:16 Popularity:
Cold storage installation isDuring the process of building a cold storage, it is an important step. After the installation of the cold storage, testing and debugging work is usually carried out. Firstly, the details of the cold storage installation must be familiar with the drawings, specifications, and standards. Before the installation of the cold storage, professional cold storage personnel must disclose to the construction management personnel of the construction unit.
1. Unpacking inspection should be carried out before the installation of the cold storage. The unpacking inspection personnel are composed of representatives from the construction unit and the construction unit. Check whether there are random documents such as packing lists, installation drawings and technical instructions, product certificates, and product performance testing reports. Check whether the random components and documents are complete and undamaged, whether the specifications and models of the cold storage meet the requirements of the design drawings, whether the surface of the cold storage components have undergone rust removal and anti-corrosion treatment, and whether the color tone of the surface is consistent, without obvious scratches, rust spots, scars, bubbles, and paint peeling, These are all precautions to be taken before installing the cold storage.
2. Before the foundation acceptance of the cold storage is in place, it is necessary toThe foundation shall be inspected and accepted, and the cold storage can only be installed after the concrete foundation reaches the curing strength, the surface is flat, and the position, size, and standards meet the requirements. During inspection and acceptance, the basic dimensions, centerline, markings, and measured dimensions of each type of cold storage should be compared with the design plan according to the installation instructions and physical dimensions, and the design dimensions should meet their requirements.
3. Cold storage acceptance and storage: In order to solve the narrow construction site, the following principles will be followed for cold storage acceptance and storage: the construction unit must provide our company with a civil engineering schedule, so that our company can order cold storage materials, try to shorten the storage period and secondary transportation. When the expected purpose cannot be achieved, temporary storage yards should be arranged as close as possible to the construction site to inspect and store the cold storage to prevent loss or damage, It is also convenient for handling and lifting.
The precautions to be taken in the acceptance work of these cold storage facilities should be sought from a professional cold storage installation companyBuilding a cold storage is relatively reassuring.